2018 Week Four Recap

Here are some quick recap from week four:

  • The manufacturing sub-team worked on the elevator and the drives.
  • The design sub-team finished the second version of the elevator and made the lifting system for the second elevator. They also made renders for CDR (Critical Design Review).
  • The PR sub-team made a powerpoint presentation for CDR.
  • Lastly, the electronics sub-team wired the robot.